NGED power telemetry

The power readings are half-hourly telemetry from 32 time series in NGED's trial area, and several of their properties change how an experiment must read them. This page lists the properties that have cost experiments time. The processing steps themselves are on the data-processing page, and the context of the network is on the network page.

The series

  • There are 32 series that carry data. They are 16 Primary substations, 6 solar farms, 3 wind farms, 2 grid supply points (GSPs), 2 bulk supply points (BSPs), and 3 other generators or storage units (home page) (disk).
  • The TimeSeriesMetadata table has 33 rows. One row has no data. Count 32 series, and do not change 32 to 33 (disk).
  • "32" also counts something else on the network page. The 41 connected hydro sites sit across "32 distinct primary substations" (network page). That is a count of Primaries across all four licence areas and has no link to the 32 trial series (docs).
  • The time_series_type column does not say what a generator is. A type of "Other (Generation)" need not be solar, so do not assume a daylight profile (exp 182; one farm behind D8; provisional).
  • Label the generators "Solar farm A" to "Solar farm F" and similar outside the private data store. studies.anonymise holds the labels. Substations may be named. The D codes (D1 to D22) that the write-ups use are anonymised labels of the demand-side series, defined in the glossary (code).

Units

  • A series is metered in MW (signed active power) or in MVA (apparent power, never negative). Read the unit from the units column. Eight of the 16 Primaries are metered only in MVA, so solar output behind one of them appears as demand in daylight (disk).
  • Use an MVA Primary for demand only on dark rows. The rule, its evidence, and the row counts are in the data-processing page (exp 103; 8 MVA Primaries; established).
  • A negative value at an MVA series is a fault between the meter and us, not an export (PowerTimeSeries field description) (code).
  • GSPs and BSPs are not clean demand. The GSPs are dominated by generation, and the BSPs sum the trial Primaries (data-processing page; exp 103; 2 GSPs, 2 BSPs; established).

Raw and cleaned tables

  • Two Delta tables hold the power: data/NGED/power_time_series.delta (raw) and data/NGED/cleaned_power_time_series.delta (cleaned). The cleaned table holds every raw row plus a nullable drop_reason column that names the cleaning rule that flagged the row (code).
  • Read power through studies.power.scan_power. scan_power keeps only the rows with a null drop_reason. A study must not name the raw table; a test enforces this (code).
  • Read the raw table only when the question is about availability. The raw table is what NGED delivered, and it holds the rows that cleaning flags (exp 182; series 32 and 33; provisional).
  • One cleaning rule exists today: substation_zero. It flags a reading of exactly 0 from a Primary, BSP, or GSP (nged_data.cleaning) (code).
  • substation_zero drops real zeros for a switched-out transformer. Switching experiments that need those rows must treat the flagged rows as kept (zero-reading entry; exp 132; switching log, few events; provisional).
  • For time_series_id 32 and 33, the cleaned and raw tables hold identical rows (exp 182, e00182_check.py; 2 series; provisional).

Timestamps

  • The time column marks the end of the half-hour that the reading covers. Do not shift it. Power timestamps show no 30-minute error on either side of NGED's fix of 2026-03-26 08:30 UTC (data-processing page; exp 103; 6 metered solar farms, with the Primaries only weakly tested; provisional).
  • Before that instant, the ingest moves NGED's stamp 30 minutes earlier (PowerTimeSeries.correct_late_timestamps). A study must not shift the stamp a second time (code).
  • Join hourly power to a weather product that stamps the end of its hour on (time - 1 µs).truncate("1h") + 1h. The evidence is on the data-processing page (exp 103; CAMS and 6 metered solar farms; provisional).
  • Assume a power reading reaches the forecast 3.5 hours after the half-hour it covers. No experiment has measured the delay on live telemetry (exp 87, 104, 106; assumption; provisional).

Gaps, ramp-up, and regime changes

  • Count a series' history from its first unflagged row. Only five Primaries hold long histories: D5, D10, and D11 from 2019-09, D14 from 2019-10, and D16 from 2020-12. The late starters begin between 2023 and 2025 (exp 103; 16 Primaries; established).
  • The start cuts and the fixed lockdown window are on the data-processing page. See trim the start of each series and fixed windows (exp 6, 102, 103, 173; established).
  • Some series changed regime. D8's weekday daytime demand fell from about 9 MW to about 3 MW between 2023-10 and 2025 (exp 103; D8; provisional).
  • A residual-only segmentation dates D8's break exactly but finds only about half of 10% steps. At a penalty low enough to date the 2023-08-15 break it also finds 2 to 3 false regime changes per Primary-year, and a penalty that keeps false changes under 1 labels 42% of 14 to 60 day load shifts as states (experiment 295; 14 Primaries, injected steps; provisional).
  • D8's multi-day drops coincide with a gas-engine detector's running states. The detector flags 27 of the 28 drops that began after the engine left D8's reading, against about 1 in 5 comparable stretches. The link between the drops and the engine is not proved, because the drops and the detector both read D8's residual (experiment 291; D8; provisional).
  • Solar-farm outages are too rare to test an availability state. Five of the six farms have at most 34 outage half-hours in the scored year, and the sixth has 165. An outage half-hour is a daylight half-hour with output under 5% of the physical power model's forecast (exp 301; 6 farms, one year; provisional).
  • About 3.0% of the six farms' scored daylight half-hours read exactly zero. Count the zeros before reading coverage at the 0.01 quantile: in own history, 1.2% to 1.4% of actual values fall strictly below it (exp 321; 6 farms, scored year; provisional).
  • A metered solar farm can climb to its rated output in stages over months. One farm took eight months (network page). The metered farms miss 7.6% to 27.6% of their half-hours, so check coverage before comparing farms (exp 179; 6 farms, one year; provisional).
  • A flat top in a farm's output is not proof of clipping. A pre-registered rule found AC clipping at 2 of 6 farms and a post hoc rule at 4 of 6, and an export cap or panel geometry makes the same shape (exp 179; 6 farms; provisional).
  • The farm series behind a disaggregated Primary can be almost absent. For D8, one farm has one raw reading ever, so "missing" is the baseline (exp 182; D8; provisional).
  • A metered farm's effective_capacity_mw may itself be estimated from output. Power over capacity near 1.0 is therefore not an independent level (exp 179, 183; 6 farms; provisional).

Capacity

  • Scores are in points of capacity, where capacity is the 99th percentile of the absolute power over the series' whole observed history. One point is 1% of that value. See the glossary (code).

Last checked against experiment 321.