Experiment 37: does a neighbour-balance detector find logged load shifts in the telemetry?

We asked whether comparing a substation with its neighbours can find the moments when load was switched from one substation to another, which NGED's logs of closures record. We built a detector based on the balance between neighbouring substations and a simpler detector that looks at one series, and measured how much of the switched power each found, against how many alarms had no logged cause. The neighbour-based detector found 0.326 of the switched power in the validation months (the even-numbered months, kept apart from the months used to set its threshold) and beat the single-series detector. The 18 visible switching events were too few to show whether it meets the bar we set.

Inconclusive: the neighbour-balance detector D1 (which flags a step in a substation that its neighbours' steps do not balance) recovers a third of the MW of the 18 visible validation transfers, and beats the single-series detector D0 by about +0.14 at equal alarm rates, but the small reference set leaves the verdict between the two pre-registered bars. D1 with a 4-hour window and a threshold of 4 reaches a size-weighted recall (the share of switched megawatts found) of 0.326 (95% interval 0.093 to 0.579) at 0.38 unexplained alarms (alarms with no logged closure) per series-month. D0 reaches 0.036 (0.000 to 0.131) at 0.14, and the difference is +0.290 (+0.034 to +0.557). The two thresholds sit at different alarm rates, so the fairer comparison is at about 0.5 alarms per series-month, where D0 reaches 0.224 and D1 0.362. Shifted logs give 0.004 for D1. D1 misses the 0.35 bar for supported and clears the 0.20 bar for refuted, so the rule gives inconclusive. Of 612 logged closures of 2 hours to 60 days, 37 are confirmed, and about 6 of those are expected by chance (shifted logs give 6.2). Eighteen of the 37 are in the validation months, above the stop-rule minimum of 15 but not by much. Recall on all logged closures of 2 hours or more is 0.086. All figures are on the residual of the monthly- retrained XGBoost model with ERA5 weather and no power lags (experiment 00017's H0.5). ERA5 arrives about 5 days after the event, so the detector is retrospective and cannot yet run live.

Validation recall against unexplained alarms

Purposes the results speak to

  1. Lagged power in the forecast. Not tested here. The confirmed transfers give the intervals in which a lag would sit inside a switching event, but no forecast uses them yet.
  2. Cleaner targets in the first model version. Untested: no mask was applied to any training target. D1 at its budget finds about a third of the MW of the visible transfers, so a mask built from it would leave most visible events in place.
  3. A report back to NGED. The 18 validation transfers and the 37 in total are a list of inferred events that NGED could check against its own logs. At 0.38 unexplained alarms per series-month, a reader would get about 6 candidate events a month across the 16 substations.

Raw data first

Where load visibly moves, the two substations step in opposite directions for the whole closure and the steps are close in size. The first figure shows the six validation closures in which both residuals have a step. The second figure shows missed closures, closures with no visible step, and the detector's alarms. The third shows quiet periods.

Residuals around the six validation closures with a step on both sides

Missed and invisible closures with the detector's alarms

Quiet periods with no logged closure

Q1: which logged closures move load

6.0% of logged closures of 2 hours to 60 days are confirmed, against 1.0% on shifted logs; the prediction of 8% to 20% was too high. Of 612 closures since 2022-01, 37 are confirmed: 13 have both sides and 24 have one side. On the shifted logs, 6.2 of 608 closures are confirmed per seed. The confirmations by duration (real against the mean of five placebo seeds, two-sided and one-sided together) are 9 against 5.8 for 2 to 6 hours, 11 against 0.2 for 6 to 24 hours, 5 against 0.0 for 1 to 3 days, 8 against 0.0 for 3 to 14 days, and 4 against 0.2 for over 14 days. The one-sided confirmations of 2 to 6 hour closures are mostly chance, because 5.6 of the 9 appear on shifted logs.

  • The steps are conserved where both sides show one. For the 13 two-sided confirmations the second step over the first step has a median of 1.09 (quartiles 0.75 and 1.30).
  • Pairs with only MW series confirm more often than pairs with an MVA series. The rates are 3 of 16 (19%) against 10 of 140 (7%), on small counts.
  • Large transfers are common among the confirmed, and small ones are absent. 17 of 37 (46%) are 25% or more of the receiving substation's load, against the predicted third at most. No confirmed transfer is under 10% of that load, so the small-event tail cannot be measured here, and the headline recall describes only transfers of 10% or more.

Step on one substation against the step on the other

The step is not constant within an event. For 26 of the 28 confirmed closures of 6 hours or more (two lack a usable half), the relative step (step divided by the substation's expected power) keeps its sign between the first and second half in 25. The second-half step is within a factor of 2 of the first-half step in 18, and the median ratio is 1.14. In 8 closures the step changes by more than a factor of 2. Both detectors still look for a constant-MW level shift in the residual, so they would misjudge the shape of those closures, though they only need the shift to be large enough to alarm.

Relative step in the first and second half of each closure

Load that splits across several receivers is hard to check with this telemetry. Of 849 logged operations since 2022, 67 have a substation on two or more sheets of the same operation. Only 9 of those have telemetry on that substation and on a receiver, and none is confirmed. In those 9, the hub's step against the sum of the receivers' steps gives a ratio from -59 to 23, and only 4 fall in the detector's accepted range of 0.4 to 2.5. In 7 of the 9, only one receiver has a step, so no split was estimated. The detector reports splits for its own alarms (114 of D1's 347 alarms at the headline threshold name two or more neighbours), but no logged operation checks them.

Q2: does switching matter to the stack's errors

Confirmed-transfer half-hours hold 0.9% of the stack's cases and 39.7% of its threshold-weighted score at the 99th percentile, but 99.9% of that share lies on series 17 and 18, almost all in one 370-hour closure. That closure is sheet 17-18 from 2025-12-30. It has a step on series 18 only, and the step shrinks to about zero by the second half. The stack is experiment 19's N1 with the 14-day correction. The cases are July 2025 to 2026-03-25. The quantile score share of confirmed half-hours is 2.7%. Per case, the threshold-weighted score of a confirmed half-hour is 40 times that of a logged-but-unconfirmed half-hour and 75 times that of all non-confirmed half-hours (83 times that of half-hours with no logged closure). The prediction that confirmed half-hours hold at least twice the score per case of unconfirmed ones therefore holds, and the prediction that all logged half-hours hold under 44% of the score fails (confirmed plus unconfirmed: 51%). The confirmed share on the other substations rounds to 0.0000.

Shares of cases, quantile score, and threshold-weighted score by class

Q3: the detectors

At the budget fixed on odd months, D1 beats D0 at the 4-hour window on even-month transfers, and the gain shrinks when the two are compared at equal alarm rates. Weighted recall is the share of the transfers' MW that the detector flags, with an alarm on either substation, or any substation of the same operation, within 2 hours of the onset.

Detector, window Threshold Alarms per series-month, tuning / validation Size-weighted recall (95%) Unweighted All logged closures of 2 h or more Shifted logs
D0, 4 hours 7 0.23 / 0.14 0.036 (0.000 to 0.131) 0.056 0.013 0.003
D1, 4 hours 4 0.32 / 0.38 0.326 (0.093 to 0.579) 0.278 0.086 0.004
D0, 24 hours 4 0.35 / 0.28 0.276 (0.098 to 0.524) 0.389 0.056 0.002
D1, 24 hours 2.5 0.11 / 0.07 0.171 (0.026 to 0.383) 0.222 0.033 0.004
  • Contrast. D1 minus D0 at 4 hours is +0.290 (+0.034 to +0.557). The largest transfer holds 12% of the weight, and D1's recall without it is 0.373.
  • The pre-registered grid does not match the two detectors' alarm rates. The next D0 threshold down (6) has 0.54 alarms per series-month on tuning, just over the budget, and a validation recall of 0.224 at 0.49 alarms per series-month.
  • Post hoc, a finer grid (steps of 0.25) moves both budgets. D0 at 6.25 reaches 0.074 (0.000 to 0.206) and D1 at 3.75 reaches 0.362 (0.127 to 0.621) at 0.50 validation alarms per series-month, with a difference of +0.288 (+0.030 to +0.558). At the same validation alarm rate of about 0.5, D0 at 6 gives 0.224 and D1 at 3.75 gives 0.362, a gap of about +0.14 that has no interval. The verdict stays as pre-registered.
  • By size band, D1 finds more of the largest transfers. Unweighted recall for transfers of 25% or more of the receiving load is 0.43 for D1 and 0.00 for D0, and for 10% to 25% it is 0.18 and 0.09. Recall weighted by share of the receiving load, and precision by size band, are not reported: precision needs a reference set of every real event, which the logs do not give.
  • Detection delay. The median offset of the alarm from the first affected stamp is 0 for D1 and 1 half-hour for D0.
  • The month-boundary check is clean. 2.3% to 2.6% of the 4-hour alarms fall on the first day of a month (chance 3.3%), and none of the 24-hour alarms do.

Recall by transfer size

Predictions against results

  • Q1 missed: 6.0% confirmed against 8% to 20%, and 46% of the confirmed at 25% or more against a third at most. The MW pairs confirm more often, as predicted.
  • Q2 held for the ratio and failed for the share (51% against under 44%).
  • Q3 partly held. D0 recall at 4 hours (0.036) was below the predicted 0.20 to 0.40. D1 (0.326) fell inside the predicted 0.30 to 0.55, near its lower edge. D1 minus D0 was at least +0.10, the placebo recall was under 0.08, and recall on all logged closures was under 0.10. The prediction that D1 reaches 0.5 or more on transfers of 25% or more of the load missed: 0.43.

Limits

  • The confirmation label uses the same residual as the detectors, so recall on confirmed transfers is an upper bound for load the residual can see at all.
  • Unexplained alarms are an upper bound on false alarms, because real unlogged steps exist.
  • The reference set has 18 validation transfers, 12 of them one-sided. The intervals are wide and a rerun with different odd and even months would move the headline.
  • Series 12 and 13 have residuals only from 2026-02, so closures on their sheets are mostly one- sided.
  • The substation pair 14-25 is missing from the interconnection list, so the detector cannot attribute those closures.
  • Two planned figures are not drawn: the distribution of the oracle's step statistic against the placebo, and the alarm share by day of month. The Q1 and Q3 text gives the numbers they would show.

Proposed next experiment

Run F4 next: whiten the residual and score the detectors on injected transfers. The design's rule names no follow-up for inconclusive, so each candidate's own condition decides. F1 needs supported, and the 40% confirmed share of the stack's threshold-weighted score sits on series 17 and 18, almost all of it in one 15-day closure from 2025-12-30. F3 needs more than a third of the missed transfers to be grouped operations, and 2 of the 13 missed validation transfers are. F4's condition holds: D1 misses 4 of the 7 validation transfers of 25% or more of the receiving load. D0 with a 24-hour window reaching 0.276 also points at residual noise, not missing topology, as the cap on recall. Injected transfers remove both causes of the inconclusive verdict: only 18 validation transfers, and a confirmation label built from the detectors' own residual. Choosing F4 is a judgement, because the rule has no branch for inconclusive.

  • Hypothesis. An AR(1) model per series and hour of day, fitted on odd months, whitens the H0.5 residual enough that D1 finds more of the injected load at the 0.5 budget.
  • Prediction. On injected validation transfers of 10% or more of the receiving load, D1 on the whitened residual reaches a size-weighted recall at least 0.10 above D1 on the raw residual, and at least 0.35, with a placebo recall of 0.08 or less. The prediction fails if the gain is under 0.10 or its 95% interval includes 0.
  • Decision rule. supported when both bars hold, refuted when the gain's interval includes 0, and inconclusive otherwise. The +0.10 bar matches experiment 37's D1-minus-D0 bar. About 600 injected validation transfers should give an interval of roughly plus or minus 0.04 on a recall, a binomial estimate rather than a measurement. If supported, rerun experiment 37's verdict on its 18 real transfers with the whitened D1, and move to F1 if that verdict is supported.
  • Contrasts. Raw against whitened residual, for D0 and D1, at windows of 4 and 24 hours, each re-tuned on odd months to 0.5 unexplained alarms per series-month. The primary contrast is whitened D1 minus raw D1 at 4 hours. The other contrasts are reported and decide nothing.
  • Injection. Transfers go into quiet periods with no logged interval within 7 days. Each moves a fraction of the donor's expected power, so the moved load keeps the donor's daily shape, to one or two interconnected neighbours with drawn split fractions. Durations are drawn from the 37 confirmed closures, and sizes span the under 10%, 10% to 25%, and 25% or more bands. Recall is weighted by MW and by share of the receiving load, and the under-10% band decides nothing.
  • Stored. Scratch tables only, under data/ml-experiments/<id>-switching-whitened-residual/: the whitened panel, the injected-event table with true split fractions, the alarm tables, and the recall curves.
  • Compute. CPU only, at most 2 cores, under 1 hour.
  • Size: medium. What gets stored: scratch tables only. Production serving path: not touched. Degradation rule: not touched. More than one defensible design: yes, the whitening model and the injection shape, both fixed above. Callers nameable without searching: yes, only the experiment's own folder.
  • First steps. Copy e00037_grid.py, e00037_detect.py, and e00037_score.py into the new folder, then write a whitening script (AR(1) fit on odd months, whitened panel) and an injection script (quiet-period finder, shaped injection, event table), each checked on a synthetic panel before any real run.