Evaluating disaggregation: a multi-pronged protocol

Status: 🔬 v2 research. This applies to the full disaggregation problem (v2) — the plan and architecture live on the canonical Net-demand disaggregation roadmap page. The v0.7 capacity estimation for metered generators is evaluated separately, with its own head-to-head protocol against the metered ground truth. See the roadmap index for status conventions.

Substation disaggregation has no single clean ground truth: by definition, you are estimating quantities that are unmetered. Chasing a single objective metric is therefore a trap. The rigorous approach is a basket of complementary partial evaluations, each with different biases, where agreement across them is the real signal.

The evaluation protocol is not a detail — it is arguably the hardest and most publishable contribution of the v2 work. The same structural challenge arose in domestic NILM (where individual appliance ground truth is similarly hard to obtain), and building a credible multi-pronged protocol is a natural continuation of that prior work.


Spoke 1: Synthetic aggregation ("the Neural NILM move")

Take individually metered sources (customer-metered PV/wind, the metered BESS, etc.), sum them into a synthetic "substation," disaggregate, score against the held-out components. This gives an exact ground truth because you constructed the aggregate.

Caveat: a synthetic clean sum lacks switching events, MVA bounce, false zeros, unmetered load, and correctly-scaled correlated co-movement. It systematically flatters performance — it measures the model on an easier problem than reality. Always report as "performance under idealised aggregation," never as real-world skill.


Spoke 2: Partial / spot ground truth (held-out metered sources)

Where a generator is metered behind a primary, pretend it is unmetered, disaggregate it out of the real net flow, compare to the metered value. Real (not synthetic) ground truth on real substation data, for the subset where metering happens to exist.

Caveat: biased to the sites where metering happens to exist, which may not be representative of the unmetered fleet.

Concrete example in the NGED dataset: Stickney primary's midday peaks correlate with the separately-metered nearby Leverton solar farm — a ready-made held-out label test.


Spoke 3: Physical-consistency and conservation residuals (label-free)

You do not need labels to detect wrongness. Hard constraint: disaggregated components must sum to the measured aggregate (Kirchhoff's current law). Softer physical checks: disaggregated PV ≈ 0 at night and bounded by the clear-sky envelope; disaggregated wind correlates with wind speed, not irradiance; estimated unmetered-PV capacity is physically plausible given the substation's geographic footprint.

Violations are detectable errors without any ground truth — a rigorous "wrongness floor" that discriminates between methods. This spoke is underused in the disaggregation literature.


Spoke 4: Cross-source corroboration (label-free, indirect)

Where an independent dataset should predict your disaggregated quantity, agreement is evidence. The main example: estimated unmetered-PV capacity per primary vs. registered PV in the ECR / MCS for that substation's geographic catchment (recoverable via the MPAN→substation mapping).

Caveat: the gap between the estimate and the register is partly the unregistered fleet you are trying to find, so exact agreement is not expected. Gross disagreement in the wrong direction (estimate < registered) is a detectable error. Weak but real-world triangulation.


Spoke 5: Second-order forecast improvement

Does disaggregating the substation signal before training improve net-demand forecast skill on the held-out test set? This evaluation has clean ground truth (you are forecasting the future against observed meter readings).

Caveat: this measures the instrumental value of disaggregation for forecasting, not disaggregation fidelity. A disaggregation that is wrong-but-harmless-to-the-forecast scores well; a correct-but-forecasting-irrelevant disaggregation scores "useless." Report this as a distinct quantity from disaggregation accuracy. Note: this is arguably the most decision-relevant evaluation for NGED, because their goal is better forecasts for flexibility procurement.


Spoke 6: Recovery on a fully-instrumented holdout (strongest)

A single substation, even briefly, where every feeder and embedded generator is individually metered, used purely as validation. One such site anchors the whole evaluation. Worth asking NGED and UKPN whether one exists or could be temporarily instrumented during a maintenance window.


The structural conclusion

A good method scores well across all six spokes despite their differing biases. A method that scores well on synthetic aggregation (Spoke 1) but fails physical-consistency checks (Spoke 3) on real data is telling you something — it has overfit to the easy case. The leaderboard columns for disaggregation are not "the metric" — they are these spokes. Because labels are weak, the protocol must be more carefully reasoned and transparently caveated than a standard forecasting evaluation: "no clean ground truth" must not slide into "any evaluation will do."