Status legend — ✅ Implemented in code · 🚧 Planned · 🔬 Research (v2). See the roadmap index for the version timeline these statuses refer to.


How forecasts are delivered

For v1 of the live service, OCF delivers live forecasts (and the supporting tables below) as Delta Lake tables in an AWS S3 bucket. We are not building a REST API for v1 (a REST API is a v2 stretch goal); an API may be added later if it brings additional benefit.

  • Why Delta Lake? It is just Parquet files plus a transaction log, giving ACID guarantees on cheap object storage — NGED never reads a half-written forecast, and the tables are readable from Excel, Polars, pandas, DuckDB, Power BI, etc. The full rationale (including the comparison with a custom REST API) is on the durable Forecast Delivery architecture page.
  • Which bucket: these five tables live in a dedicated nged-forecast-delivery S3 bucket, physically separate from OCF's own working tables (NWP, raw power telemetry, forecast metrics, …) in a second nged-forecast-internal bucket. NGED gets read access to both — there's no reason to withhold the internal tables — but only the five below are a stable contract: the internal bucket's tables may change shape at any time with no notice. See Forecast Delivery: Securing it for why, and Setting up the live service on AWS for the concrete bucket/IAM setup.
  • Access: both buckets hold data about NGED's customers, so neither is public — both are protected with S3 authentication (mirroring how NGED protects their own time-series JSON bucket).
  • Update cadence: every 6 hours, when a new forecast run is generated.
  • Reading it is a one-liner — scan_delta is lazy and only fetches the partitions a query touches, so a single forecast comes back in a fraction of a second even though the full dataset is billions of rows:
dataframe = polars.scan_delta("s3://path-to-forecast")

There are five tables. This table tracks where each one stands today:

# Table Status Where the schema lives
1 power_forecast ✅ Deterministic-ensemble flavour implemented (v0.1); percentile flavours planned for v0.5 contracts.power_schemas.PowerForecast
2 power_forecast_warnings 🚧 Planned (partial at first; complete by v1.0) not yet in code
3 asset_health_history 🚧 Planned not yet in code
4 effective_capacity ✅ Implemented in v0.1 (static P99 estimate); time-varying upgrade planned for v0.7 contracts.power_schemas.EffectiveCapacity
5 substation_switching 🚧 Planned (v0.6), conditional — see the Table 5 status note not yet in code

Naming note. The Milestone 1 report drafted these tables with the column name timeseries_id, but the codebase uses time_series_id everywhere. The implemented PowerForecast schema uses time_series_id, and the planned tables below should adopt the same name for consistency.


Table 1 — power_forecast

Status: ✅ Implemented as contracts.power_schemas.PowerForecast, but only the deterministic-ensemble representation of uncertainty (below; v0.1). The two percentile-based representations are 🚧 planned for v0.5.

Stores OCF's probabilistic power forecasts. The table extends ~14 days forwards in time (the forecast horizon) and backwards to the start of the backtesting period.

The Milestone 1 report describes three ways of expressing uncertainty. We may deliver one or several of these:

  1. Ensemble of deterministic forecasts — one row per NWP ensemble member. ✅ Implemented in v0.1.
  2. Percentiles — one row per valid_time, with a column per percentile. 🚧 Planned (v0.5).
  3. Ensemble of percentile forecasts — per-member and per-percentile. 🚧 Planned (v0.5).

Representations 2 and 3 are two stages of one pipeline, not independent options: Representation 3 (per-member conditional quantiles) is produced by the model, and Representation 2 is derived from it by linear-pool mixing — see Probabilistic forecasting from NWP ensembles for the theory and Phase D of the probabilistic evaluation plan for the implementation plan.

Fields common to all three representations

Field Data type Notes
time_series_id int32 The time-series ID provided by NGED. E.g. ID 1 is the raw MW flow for the "BOSTON" BSP; ID 10 is the disaggregated demand for the "SPILSBY" primary; ID 21 is the MW flow for a customer's PV site.
valid_time datetime (UTC) The time the forecast is about.
nwp_init_time datetime (UTC), nullable When the NWP model was initialised. Uniquely identifies the NWP ensemble member, and matters when NWP is delayed or when we deliberately use lagged NWP runs to grow the ensemble. Null for models that do not use NWP (e.g. persistence baselines).
power_fcst_init_time datetime (UTC) When OCF's power-forecast model was initialised (the "t0").
power_fcst_model_name categorical (string) Name of OCF's model, e.g. "xgboost_baseline". Set by the BaseForecaster subclass.
power_fcst_model_version int16 Version of OCF's model.

Implemented extensions (beyond the report draft): the live PowerForecast schema also carries ml_flow_experiment_id (int32, nullable) and fold_id (categorical; the CV validation year, or "live" for production forecasts). These let cross-validation rows and live rows share one table — filter on fold_id to select the population you need. See metrics & leaderboard.

Representation 1 — ensemble of deterministic forecasts ✅

Field Data type Notes
ensemble_member int8 ID of the NWP ensemble member driving this forecast. ECMWF ENS has 51 members.
power_fcst float32 OCF's power forecast. In this early version the value is in physical units (MW for active power, MVA for apparent power).

🚧 Planned change — normalise power_fcst to [−1, +1] (#246, v0.1). The delivery contract is a normalised forecast in the range [−1, +1], which NGED multiplies by a capacity to obtain MW/MVA (see forecast building blocks). The code still forecasts raw MW/MVA, but now that the static P99 effective_capacity estimate exists there is no need to wait for dynamic capacity estimation: the switch to [−1, +1] is planned for v0.1. This is also noted in a comment on the PowerForecast.power_fcst field in power_schemas.py.

Representation 2 — percentiles 🚧

One row per valid_time, with one column per percentile. This is the primary NGED-facing probabilistic representation, derived from Representation 3 by pooling the per-member quantiles (the equal-weight mixture — not per-level averaging, which would discard the between-member spread; see the explainer):

Fields Data type Notes
p1, p2, p5, p10, p20, p35, p50, p65, p80, p90, p95, p98, p99 float32 The power forecast at each percentile. NGED is far more interested in the tails than the shoulders. Read p50 as "50% chance the true power flow is below this value", p99 as "99% chance below", etc. (Scaled to [−1, +1] once normalisation lands.)

Representation 3 — ensemble of percentile forecasts 🚧

Each ensemble member is itself a percentile forecast — "given this member's weather, power will land in this range with this shape" — produced by a quantile-objective model (see Phase D). Primarily an internal stage that Representation 2 is pooled from, but it may also be delivered for power users who want the weather-scenario structure:

Fields Data type Notes
ensemble_member int8 ID of the NWP ensemble member.
p1, p2, p5, p10, p20, p35, p50, p65, p80, p90, p95, p98, p99 float32 The power forecast.

Table 2 — power_forecast_warnings 🚧

Status: 🚧 Planned. Some warning types depend on switching-event detection and effective-capacity estimation, which do not exist yet — so this table will be partial when it first ships and complete by v1.0.

Tells NGED whenever we detect abnormal behaviour in the most recent meter reading for a time_series_id. Such abnormality means the asset's actual performance may deviate from the "normal operation" forecast over the next 14 days. Each warning is valid for one entire forecast run and is refreshed every 6 hours.

Example: a generator has run at only 60% of nominal capacity for the last month. The "normal operation" forecast still assumes 100% capacity, so we must flag that the forecast is deliberately deviating from reality.

Join power_forecast_warnings to power_forecast on time_series_id and power_fcst_init_time.

Field Data type Notes
time_series_id int32, primary key Time-series ID provided by NGED.
power_fcst_init_time datetime (UTC), primary key When OCF's model was initialised.
last_observation_time datetime (UTC) Time of the last valid meter reading available when this forecast was created.
warning_type enum (see below) Refers to the meter reading as of last_observation_time.
warning_description string or null Human-readable detail, e.g. "The meter's value has been stuck at 2.1 MW for the previous 52 hours."

warning_type enum values (mostly mutually exclusive — there is a hierarchy: a meter error blinds us to all other errors at that timestep; a generator/circuit fault blinds us to reduced capacity):

  • HEALTHY
  • MISSING VALUE
  • STUCK TIMESERIES
  • INVALID TIMESERIES VALUE — note: not "invalid meter value"; NGED call meters "analogues"
  • GENERATOR OR CIRCUIT FAULT
  • GENERATOR REDUCED CAPACITY
  • SUBSTATION ABNORMAL RUNNING ARRANGEMENT
  • STALE NWP — the weather feed was delayed, forcing the forecast onto stale NWP
  • STALE POWER — the live power data was delayed

Self-assembly note: NGED (or any user) can build their own forecast by multiplying the (future) [−1, +1] power_forecast by a capacity derived from the effective_capacity table's effective_capacity_mw column — its maximum over history (→ a "normal" forecast) or its most recent value (→ a "prevailing conditions" forecast). See forecast building blocks.


Table 3 — asset_health_history 🚧

Status: 🚧 Planned.

A complete historical record of the health of each time_series_id. The main use case: when an NGED engineer sees a warning, they can manually investigate the recent behaviour of that time series.

Field Data type Notes
time_series_id int32, primary key Time-series ID provided by NGED.
time datetime (UTC), primary key Timestamp from the original NGED time series.
warning_type enum Same vocabulary as Table 2, but only the backward-looking subset (no STALE NWP / STALE POWER): HEALTHY, MISSING VALUE, STUCK TIMESERIES, INVALID TIMESERIES VALUE, GENERATOR OR CIRCUIT FAULT, GENERATOR REDUCED CAPACITY, SUBSTATION ABNORMAL RUNNING ARRANGEMENT.

Notes on specific flags:

  • GENERATOR OR CIRCUIT FAULT is set whenever metered generation is zero when the generator should be generating (e.g. a solar farm reading zero at midday on a sunny day). It can also be set manually to represent, e.g., a maintenance schedule supplied by the generator.
  • STUCK TIMESERIES / INVALID TIMESERIES VALUE are set for any historical timestep where the metered values are "stuck", or are physically implausible (e.g. 1 GW from a 1 MW solar farm).

Table 4 — effective_capacity

Status: ✅ Implemented (v0.1) — the effective_capacity Dagster asset writes P99 of observed power as a static capacity proxy. Schema lives in contracts.power_schemas.EffectiveCapacity. Planned upgrade in v0.7 (#247) to time-varying capacity estimation, produced by whichever candidate estimator wins the head-to-head — see Capacity estimation.

OCF's estimate of each generator's or substation's effective capacity at every half-hourly timestep of the historical time series data. This table is backward-looking only — it does not cover the forecast period.

v0.1 approach: one row per time_series_id, effective_capacity_mw = P99 of |power| over the full available observation history. This is a static scalar per series — a robust capacity proxy that is less sensitive to outlier spikes than the maximum, and more capacity-representative than the mean (which is dragged down by zero-output periods for PV/wind). It is also the denominator used to normalise NMAE in the forecast_metrics table — see Normalising NMAE by effective_capacity for why v0.1 stores one scalar row per series (rather than repeating the value at every half-hour) and how the metrics join evolves for the v0.7 upgrade.

v0.7 upgrade: replace the static P99 with a time-varying estimate from the winning capacity estimator. For generators, the prior comes from the Embedded Capacity Register and is updated at each half-hour from the generator's power time series, absorbing PV-panel degradation, partial inverter trips, etc., but ignoring ANM (a wind farm ANM-capped at 5 MW with 10 MW physical capability has effective_capacity_mw = 10). For substations, the 99th percentile of observed load over a rolling window, under normal running arrangement only. During a switching event, effective capacity = last known normal-arrangement value plus the "switched power" from Table 5 — a step that inherits Table 5's conditional status, since it needs the per-event magnitudes only the discrete detector produces (see the decision point); if the discrete detector is not built, in-event effective capacity falls back to the last known normal-arrangement value alone. The v0.7 estimate should carry uncertainty (a first-class judging criterion in the head-to-head), so the single effective_capacity_mw column is upgraded to a mean + std pair (#247, matching Table 5's Normal-distribution convention); the asset body changes to emit one row per (time_series_id, time), and the metrics pipeline swaps its time_series_id-only capacity join for a temporal as-of join (see Normalising NMAE by effective_capacity).

Field Data type Notes
time_series_id int32 NGED's time-series ID.
time datetime (UTC), every half hour The half-hourly timestep this estimate applies to. In v0.1, set to the end of the available observation history for that series.
effective_capacity_mw float32 OCF's estimate of the effective capacity (MW) at this timestep.

Table 5 — substation_switching 🚧

Status: 🚧 Planned (v0.6), now conditional. Depends on switching-event detection — and whether a discrete event table ships at all is an open question: continuous per-substation switching-state signals may be delivered instead. See the decision point in the switching-events plan.

Captures the amount of power OCF estimates has been switched from a "donor" substation to a "recipient" substation. OCF estimates switching events purely from the power-flow time series and the known electrical connections between substations — it has no access to NGED's operational switch-control system. Represented as the mean + std of a Normal distribution.

A single donor can split power across multiple recipients (e.g. donor A loses 1 MW, emerging as 0.6 MW to B, 0.3 MW to C, 0.1 MW to D). The table therefore uses one row per recipient.

Field Data type Notes
donor_time_series_id int32 Time-series ID of the substation that has had power diverted away from it.
recipient_time_series_id int32 Time-series ID of the substation power has been diverted to.
time datetime (UTC) Timestamp from the original NGED time series.
switched_power_MW_mean float32 (strictly positive) Mean of OCF's estimate of power diverted from the donor to the recipient.
switched_power_MW_std float32 Standard deviation of that estimate.

Known simplification. Switching events transfer behaviour, not a constant amount of power. v1 (the v0.6 statistical detector) estimates only the transferred magnitude. Reconstructing the latent demand under the normal running arrangement — and capturing the fact that a transferred slice can carry a different demand/PV/wind mix than its parent — is the job of the v2-scale mixture models. See Switching events & latent demand.